Radioisotope power

Nuclear generators for data centers

Quiet, clean, baseload energy from 1 to 100 kW

AI and enterprise workloads are driving exponential growth in compute infrastructure. Mission-critical operators need power they can count on for years, deployable in months.

For operators

Built for the data hall

  • High energy density

    A Co-60 capsule at the core of every module, commercially available, compact, and purpose-built to drive our generators.

  • No moving parts

    Thermophotovoltaic semiconductors replace turbines and steam cycles for solid-state conversion with 0 dB output.

  • Modular deployment

    Integrated cooling; outdoor placement at 85°C surface temp. Units delivered and activated in under 12 months.

Full product details →

The challenge

Data center power crisis

Grid deployment takes 5 to 7 years relative to 1 to 3 years for constructing a data center. Severe energy shortages have congested transmission lines and pushed $/kWh pricing higher. Edge and remote facilities face high costs, or are denied grid access entirely.

Our modular isotope generators deliver uninterruptible baseload power directly at computing sites. Sell compute to customers today while competitors wait on utility timelines.

235 Electric radioisotope generator, CAD assembly view
Modular radioisotope generator
Markets

Who we serve

We are focused on data center operators, campus power providers, nuclear isotope suppliers, and engineering manufacturers in the US, EU, and Southeast Asia.

About the company →